Alta 1 Joondalup

Project: Alta 1
Location: Joondalup
Duration: 6+ Months

Description

Works on Alta 1 Joondalup started in mid 2019 and was completed by end of 2019, working with the builder were able to get the desired finish. Works consisted of Kingklip roof sheeting, Metalic spandek walls, roof plumbing works and a lot of penetrations!