Hertz Perth Airport

Project: Hertz Perth Airport
Location: Perth Airport
Duration: 3 Months

Description

Roofing 2000 installed the roofs at Hertz Perth Airport through the holiday period at the end of 2016. 2300m² of new roofs to the administration block, wash bays & detailing areas are a combination of Arcpanel insulated roof panel system and conventional Colorbond roof systems. Walls are clad with Colorbond S-Rib corry and TL-5 from Fielders.